Warning: strtotime() [function.strtotime]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Europe/Berlin' for 'CEST/2.0/DST' instead in /home/setco/public_html/libraries/joomla/utilities/date.php on line 56
Warning: date() [function.date]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Europe/Berlin' for 'CEST/2.0/DST' instead in /home/setco/public_html/libraries/joomla/utilities/date.php on line 198
Zarand Coke Production

Zarand Coke Production and Tar(Bitumen) Refinery
Project : Zarand Coke Production and Tar(Bitumen) Refinery
Owner:
Mine & Mineral Production Company
Location:
Zarand - Kerman
Consultant:
Kanazin Consulting Engineers
Volume of Works:
- Form works: 65000 m²,
- Steel Structure: 1200 Tons,
- Steel Works: 1400 Tons,
- Concrete Works: 33200 m³,
- Firebrick works
- Installation of Machineries and Equipment:
5000 Tons
Goals:
The Plant is established to produce coke using coals, in Zarand City, it's located at the geographical center of Kerman province.
The Plant designed to produce 400,000 Tons Dry coke using 500000 Tons raw material (coal).
Project description:
Zarand Coke production & Tar(Bitumen) Refinery Plant established for processing and production of Coke in Zarand.
Considering the fact that,80% of coal Mines & reserve Located in Kerman province & specially in Zarand (75 Km, North-West of Kerman Country), production of 400,000 tons metallurgical coke is the main goal for establishment of the Plant By Mine & Mineral Production Company.
The products would be supplied to steel & Metallurgical Plants, Sugar Plants and other industries. In addition, the amount of 19.000 Tons of Coal-Tar will be produced in plant along with other side products such as: Sulfur, Sulfate Alumina, Benzol, Naphthalene and other products which cannot be produced in petrochemical plants.
The Plant consisted of 3 main sections:
1- Coke production line,
2- Gas refinery unit,